Reconstruction of infrastructure (2008-2010)

Information about existing situation and reconstruction of Ismayilly region infrastructure

1. Financial investments required for reconstruction of infrastructure

2. Technical condition and brief summary of financial investments of infrastructure  

3. Information about existing technical condition of infrastructure

4. Proposals regarding reconstruction of infrastructure

5. Technical indicator regarding reconstruction of infrastructure and required financial investments

Financial investments required for reconstruction of infrastructure (with thousands mantas)

1. Drinking water Supply of city - 10500.0

2. Reconstruction of sewing system - 5419.9

3. Installation of cleaning settings - 1500.0

4. Capital repair of ways - 36541.0

5. Restoration of central heating system - 764.1

6. Capital repair of Child Creative center building at park named by H.Aliyev - 1350.0

7. Setting of infrastructure in constructing new dwelling estimates in Ismayilly city  - 2818.0

Total SUM: 58 893.0

Technical condition regarding construction of infrastructure and required financial investments (thousands manta)
 
1. Drinkable water supply of city

  • Existing drinkable water lines are laid on 1988 and their length is 54 km.
  • Number of population is increased for 3 times since 1988 year.
  • Water pipeline provides with drinkable water only 26 % of population dwelling on the center of city.

Required investment - 10500.0

2. Reconstruction of sewing system

  • The length of existing sewing pipeline is 24 km, 4 km of pipeline is unfit for use absolutely.
  • 3 suburban lakes are polluting strictly due to absence of cleaning settings.

Required investment - 6919.9

3. Capital repair of ways 

  • Only 10.2 km from 62.6 km internal ways of city is covered with asphalt.
  • Capital repair works on village ways over the region with 364 km length
  • Capital repair reconstruction of 19 km part on Insmayilly – Lahij way.
  • Capital repair of 6 km way to Ivanovka village from Ismayilly – Qarameryem highway.

Required investment - 36541.0

4. Restoration of central heating system

  • Equipment heating 41 communal dwelling building is out of order due to not exploitation for long time.
  • 14 boiling house should be constructed for heating dwelling houses.

Required investment - 764.1

5. Capital repair of Child Creative center building in park named by H.Aliyev

  • Building of Child creative center situated in park was given to exploitation on 1987.
  • Capital repair and reconstruction of building is necessary.

Required investment - 1350.0

6. Setting of infrastructure in newly constructing dwelling estimates in Ismayilly city

  • Supply of electric power, gas and drinkable water, and construction of a bridge with 22 meter length
  • Construction of school for 480 pupil
  • Laying of way to dwelling estimate

Required investment - 2818.0

Total: 58 893.0

Information regarding existing technical condition of infrastructure

1. Drinkable water supply of city

  • Existing water pipeline was laid on 1988 year and its length is 54 km. The water is provided to city by Kheneye-Ismayilly water pipeline. The pipeline is able to provide only 26 % of city population because the infrastructure of city is expanded and the population of city is increased for 3.1 times in comparison to 1988 year (5800 persons in 1988, 17800 persons to 01 January of 2008 year).

2. Sewing system and cleaning settings

  • The length of existing sewing pipelines of city is 24 km. 4 km of these pipelines is ufit for use completely.
  • “Eyri chay” basin, water storage in the center of “Ashig Bayramly” and Ivanovka villages are polluting due to absence of cleaning settings.

3. Internal ways

  • Only 10.2 km from 62.6 km ways of city is covered by asphalt-concrete.

4. Heating system

  • You may say that, there is no central heating system in last three year in city excluding new constructed dwelling and administrative buildings. Equipments providing 41 communal dwelling buildings with heat are failed because of not long time usage.

5. Other objects

  • The building of Child Creative Center situating in Heydar Aliyev park had been given to exploitation in 1987 year. The building became worthless due to not repair since that time. The building needs to be capitally repaired and reconstructed.
  • Due to increasing of Ismayilly city population there was considered to allocate area for 500 families and this will cause to generation of new d welling estimates. There is necessary to create relevant infrastructure in that estimates.

Proposals regarding reconstruction of infrastructure (in thousand mantas)

1. Drinkable water supply of city:

  • Laying of water pipeline in 27 km length from Chaygovushan village Ismayilly city.
  • Laying of 35 km length water pipeline inside the city. Building of 3 water storage with 1000 ton water capacity;
  • Digging of 25 artesian wells in places where there is no natural springs, including 5 artesian wells in city;

Required investment  – 10500.0

2. Reconstruction of sewing system:

  • Laying of 30 km new sewing pipeline. Capital repair and reconstruction in 4 km of existing sewing system;

Required investment – 5419.9

3 Installation of cleaning settings:

  • Installation of 15 cleaning settings totally in regions for preventing pollution of “Eyri Chay” basin, water storages in “Ashig Bayramly” and Ivanovka villages with sewing waters;

Required investment – 1500.0

4. Capital repair of ways:

  • Conducting capital repair works in 22 streets (totally 52 km) in Ismayilly city which are under the balance of “Yolneqliyyatservis” Department and in village ways with 364 lengths;
  • Capital repair and reconstruction of 19 km part in Ismayilly – Lahij way;

Required investment – 35541.0

  • Capital repair of 6 km way to Ivanovka village from Ismayilly – Qarameryem highway Required investment – 1 000.000

5. Repair of central heating system:

  • Installation of 14 boiling room for heating communal buildings in territory of region in winter;

Required investment – 764.1

6. Capital repair of Child Creation center in the park named by Heydar Aliyev:

  • Capital repair of Child Creation center in the park named by Heydar Aliyev;
  • Provide of building with inventory and equipment;

Required investment – 1350.0

7. Creation of infrastructure in newly building dwelling estimates in Ismayilly city:

  • Electric power, gas and drinkable water supply, construction of 1 bridge in 22 meter length, building of school for 480 pupil, installation of telephone and ATS with 400 number capacity, gas supply, installation of sewing system, laying of gravel covered way to dwelling estimate;

Required investment – 2818.0

Total: 58 893.0

Technical indicator regarding reconstruction of infrastructure and required financial investments

S/S

    Name of activity

Required investment for executing
(thousand manat)

Executing period

1

2

3

4

1

On drinkable water supply

   

1.1

Laying of 27 km length water pipeline from Ismayilly city from Chayqovshan village

3610.0

2008-2010

1.2

Construction of 3 water-storage with 1000 ton water capacity

750.0

2008-2010

1.3

Laying of 35 km length water pipeline inside the city

1051.0

2008-2010

1.4

    Changing of 8700 meter water pipeline in Heydar Aliyev avenue and M.Orujov street of city

679.6

2008-2010

1.5

Capital repair of existing water storage with 1000 cube meter water capacity 

59.4

2008-2010

1.6

    Digging of 25 artesian wells in territories where there is no natural springs, including 5 artesian well in city

750.0

2008-2010

1.7

Laying of water pipeline for providing of Ivanovka village with drinkable water

3600.0

2008-2010

 

Total:

10500.0

 

2

On reconstruction of sewing system

 

 

2.1

Laying of 30 km new sewing pipeline in Ismayilly city

3302.9

2008-2010

2.2

Capital repair and restoration of 4 km part of existing sewing system of city

197.0

2008-2010

2.3

Installation of sewing system in Ivanovka village

1920.0

2008-2010

 

Total:

5419.9

 

3

On installation of cleaning settings

 

 

 

    Installation of 15 cleaning settings with 100 cube meter cleaning power in hour over the region for preventing pollution of “Eyri chay” basin, “Ashig Bayramly” and Ivanovka water storages with sewing waters.

1500.0

2008-2010

 

Total:

1500.0

 

4

Capital repair of ways

 

 

4.1

    Capital repair on 22 streets of Ismayilly city which are under the balance of “Azeryolservis” OJSC (totally 52 km)

8648.0

2008-2010

4.2

Capital repair works on 364 km length village ways

20893.0

2008-2010

4.3

 

    Capital repair and reconstruction of 19th part of Ismayilly-Lahij way

6000

2008-2010

4.4

Capital repair of 6 km length way till Ivanovka village from Ismayilly – Qarameryem highway

1000.000

 

 

Total:

36541.0

 

5

Restoration of central heating system

 

 

5.1

Installation of 14 boiling-house for heating of communal buildings in winter months on the territory of region .

764.1

2008-2010

 

Total:

764.1

 

6

Capital repair works of Child Creative Center on Heydar Aliyev avenue

 

 

6.1

 

Capital repair works of Child Creative Center on Heydar Aliyev avenue

1050.0

2008

6.2

Supply of building with inventory and equipment

300.0

2008

 

Total:

1350.0

 

7

Creation of infrastructure in new constructing dwelling estimates of Ismayilly city

 

 

7.1

Electric power supply

18.0

2008-2010

7.2

Drinkable water supply

390.0

2008-2010

7.3

Construction of 22 meter lengths bridge

350.0

2008-2010

7.4

Construction of school for 480 pupil

1400.0

2008-2010

7.5

Installation of telephone and ATS with 400 number

70.0

2008-2010

7.6

Gas supply

90.0

2008-2010

7.7

Mounting of sewing system

330.0

2008-2010

7.8

Laying of gravel covered way to dwelling estimate

170.0

2008-2010

 

Total:

2818.0

 

T O T A L   S U M  58 893.0